Les cas d'usage ne sont pas encore traduits en français ; ils s'affichent en anglais.
Spot heavy rainfall and flood situations in the municipality earlier
Local authorities forecast flood and heavy rainfall risks
Convient pour : Leaders & strategy · Office, administration & casework · Production, engineering & maintenance
You know earlier which streets, underpasses and districts will flood under a particular rainfall situation. The works depot and fire brigade can be prepared before the first emergency calls come in.
Est-ce pour vous ?
- Your municipality has repeatedly had heavy rainfall or flood callouts, and it is often the same places.
- There are readings from rain gauges, water level gauges or sewer sensors, or you can set them up.
- Fire brigade and works depot callouts are documented with date and location.
Compile a table from the incident reports of recent years: date, rainfall in one hour and in 24 hours from the nearest weather station, number of callouts per district, without addresses and names. Use the template below to show which districts react to short heavy rainfall and which to long periods of continuous rain.
Comment procéder
- Decide which situation is to be forecast
- Collect readings, maps and callout history
- Have the situation overview and forecast calculated
- Check against actual events
- Build it into alarm and emergency plans
- Refine after every event and every construction project
Modèles à copier
Le mode d'emploi complet
- 6 étapes, avec l'explication de ce qu'il faut faire exactement
- 3 modèles éprouvés à copier dans votre propre IA
- Une mise en œuvre sûre : données, vérification, décision, information
- Pièges, effort nécessaire et comment reconnaître le succès
Avec la formation, les 430 modes d'emploi vous sont ouverts pendant toute la durée de votre accès.
Même démarche, autres cas d'usage
22 autres cas d'usage suivent le modèle « Forecasting from figures ».
VW-12 · État du droit 08.10.2026